telangana electricity bill tariff 2025 charges tsspdcl slab rates domestic 2024 electricity bills sample calculation Telangana

Share
Share on Facebook
Share
Share this
Pin
Pin this

tsspdcl slab rates domestic Telangana electricity bill tariff monthly tariff charges calculation. view the tsspdcl tariff charges chart.

 

Note: every finacial year April -march 31telangana governme has decides wheter it keeps same or increase.

ex: fy 2024-25 means 1st April 2024 to 31st March 2025

tsspdcl districts: 15 districts viz., Mahabubnagar , Narayanpet, Nalgonda , YadadriBhuvanagiri , Suryapet , Siddipet , Medchal , Wanaparthy , Nagarkarnool , Jogulamba Gadwal , SangaReddy , Medak , Hyderabad , Vikarabad and Rangareddy

tsnpdcl districts: 8 districts: Mancherial, Nirmal, Kumram Bheem, Kamareddy, Peddapalli, Jagtial, Rajanna, Warangal, Hanumakonda, Mahabubabad, Mulugu, Prof Jayashankar, Jangaon, Bhadradri Kothagudem, Adilabad, Nizamabad, Karimnagar and Khammam districts.

Table of Contents

Toggle
    • Telangana electricity bill charges Slab rates fy 2024-25
    • Telangana electricity bill charges Slab rates fy 2024-25 pdf
    • tsspdcl unit charges 2023 domestic
    • Year wise Telangana electricity slab increase for bill
    • tsnpdcl slab rates domestic 2021
  • RETAIL SUPPLY TARIFF SCHEDULE FOR FY 2018-19 (RETAIL SUPPLY TARIFF RATES AND TERMS AND CONDITIONS)
    • Terms and Conditions
    • Voltage surcharge: The voltage surcharge withdrawal stands continued even for FY 2018-19.
    • Additional charges for maximum demand exceeding the contracted demand
    • Minimum charges
    • Customer charges
    • Delayed Payment Surcharge (DPS)
    • LT Category
    • HT Category
    • Reconnection charges
    • Testing charges
    • Supervision / Inspection and checking charges
    • Low power factor charges: For all consumer categories where kVAh billing is done, no Low Power Factor surcharge shall be levied.
    • Capacitor surcharge: LT consumers (except LT I Domestic) having connected loads mentioned in table below shall pay capacitor surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if capacitors are found defunct.
    • Fixed Charges – Seasonal Industries:
    • Temporary Supply for LT and HT consumers: Temporary supply can be given initially for a period up to one year as per the tariff applicable under temporary supply category. After the expiry of one year, the consumer is at liberty to seek further extension.
  • ANNEXURE 2
    • Faqs on Telangana electricity tariff charges

Telangana electricity bill charges Slab rates fy 2024-25

(Applicable with effect from 01.11.2024 to 31.03.2025 in respect of the two Distribution
Licensees (TGSPDCL & TGNPDCL) in the Telangana State and the Co-operative Electric
Supply Society, Sircilla)

Retail Supply Tariff schedule and Cross subsidy Surcharge for FY 2024-25

Telangana electricity bill charges Slab rates fy 2024-25

Telangana electricity bill charges Slab rates fy 2024-25 pdf

tsspdcl unit charges 2023 domestic

note: from feb 2024 zero cost below 200 units for white ration card holders.. go to ward office/mpdo office with ration card to get free units & gas.

Slab rate consumption 1 unit cost total cost
up to 100 units  per month  
1st 50 units cost 1.95 rupees 1.95*50=97.5
51-100 units 3.10 rupees 3.10*50=155
Sample: 95 units usage per month then

upto = 1.95*50=97.5

3.10*45=139.5 + energy charges 20+

Above 100 units & below 200 units
0-100 units 3.40 3.40*100=340rupees
101-200 4.80 100*4.80=480 rupees
Sample calculation: 190 units or below 200 units free for bpl card holders

upto 100 units 3.40*100=340rupees

and 90 units 90*4.80=432

total 340+432=772

or 340+480=upto 820 rupess free for bpl card holders as per revanth congress scheme.

 

Retail Supply Tariff Order & Cross Subsidy Surcharge Order for FY 2023-24

slab based rates for unit.

Average unit cost 5 rupees for unit..  (200 above units consumption in a month. )  201*5.10=1025 rupees

In you consume below 200 units month  

up to 100*3.40=340

100-200units  100*4.80=480

340+480=820

tsspdcl slab rate fy 2023 24

Year wise Telangana electricity slab increase for bill

Year unit cost for above 200 100-200 units up to 100
FY 2023-24 5.10 inr 4.80 3.40
FY 2022 -23 5.10 inr 4.80 3.40
FY 2018-19 5 4.30 3.30

Retail Supply Tariff Order & Cross Subsidy Surcharge Order for FY 2023-24 pdf

https://www.tssouthernpower.com/tariffschedule

tsnpdcl slab rates domestic 2021

Units in Monthly consumption and tariff rate
  1. 1-50 Units – 1.45 Rupees
  2. 51-100 units 

1st 50 units at 1.45 and remaining 51-100 at  2.6.

   3.customers with 100-200 Units monthly limit.
  • 1-50 units at 2.6
  • 51-100 Units at 2.6
  • 101-150  at 3.6
  • 151 -200 at 3.6 rupees.
4..Customers with more than 200 units consumption.
  1. Up to 50 units at 2.6
  2. 51-100  > 3.28
  3. 101-150 >> 4.88
  4. 151-200 >>5.63
  5. 201-250 >> 6.38
  6. 251-300>>6.68
  7. 301-400 >>  7.38
  8. 401-500 >> 7.68
  9. Above 500  8.38

Related How to calculate electricity bill 

TSNPDCL TSSPDCl Electricity bill sample

as on

20 Feb 2020

  • From 0-50 units, Rs 1.45
  • 51-100, Rs 2.6 per unit.
  • From 101-200, Rs 4.3 per unit,
  • from 201-300 Rs 7.2 per unit,
  • from 301-400 Rs 8.5,
  • from 401-800 Rs 9 and
  • above 800 units, Rs 9.5 per unit is charged.

No hike from 208-19

here

Telangana electricity Tariff Schedule for pdf

 

 

TSNPDCL – 2 Months

 

248 Units Days 63

Average: 122.03

3.6*248= 892 (this calculation is wrong)

124 units per month

1-50 units at 2.6   50*2.6=130

51-100 Units at 50*2.6 = 130

101-150  at 3.6

24*3.6=86.4

130+130+86.4=346.4

Average:

346.4+346.4= 692

Energy charges = 50 +50

892

RETAIL SUPPLY TARIFF SCHEDULE FOR FY 2018-19 (RETAIL SUPPLY TARIFF RATES AND TERMS AND CONDITIONS)

(Applicable with effect from 01.04.2018 to 31.03.2019 in respect of the two Distribution Licensees (TSSPDCL & TSNPDCL) in the State of Telangana and the Rural Electricity Supply Co-operative Society, Siricilla in the State)

Category

Fixed/Demand Charge (Rs./Month)

Energy Charge

Unit

Rate

(Rs./kWh or Rs./kVAh)

Low Tension

LT I: Domestic

LT I (A): Upto 100 Units/Month

0-50

1.45

51-100

2.60

LT I (B)(i):Above 100 Units/Month & up to 200 Units/Month

0-100

3.30

101-200

4.30

LT I (B)(ii): Above 200 Units/Month

0-200

5.00

201-300

7.20

301-400

8.50

401-800

9.00

Above 800 units

9.50

LT II: Non-Domestic/Commercial

LT II (A): Upto 50 Units/Month

0-50

kW

50

6.00

LT II (B): Above 50 Units/Month

0-100

kW

60

7.50

101-300

kW

60

8.90

301-500

kW

60

9.40

Above 500

kW

60

10.00

LT II (C): Advertisement Hoardings

kW

60

12.00

LT II (D): Haircutting salons consuming upto 200 units/month

0-50

kW

60

5.30

51-100

kW

60

6.60

101-200

kW

60

7.50

LT III: Industry

Industries

kW

60

6.70

Seasonal Industries (off-season)

kW

60

7.40

Pisciculture/Prawn culture

kW

21

5.20

Sugarcane crushing

kW

21

5.20

Poultry farms

kW

50

6.00

Mushroom, Rabbit, Sheep and Goat farms

kW

60

6.30

LT IV: Cottage Industries

3 1

Category

Fixed/Demand Charge (Rs./Month)

Energy Charge

Unit

Rate

(Rs./kWh or Rs./kVAh)

LT IV(A): Cottage Industries

kW

20/kW subject to a minimum

of Rs.30/month

4.00

LT IV(B): Agro Based Activities

kW

20/kW subject to a minimum

of Rs.30/month

4.00

LT V: Agriculture

LT V (A): Agriculture (DSM Measures mandatory)

Corporate Farmers

HP

2.50

Other than Corporate Farmers

HP

0.00

LT V (B): Others

Horticulture Nurseries with CL upto 15 HP

HP

20

4.00

LT VI: Street Lighting & PWS

LT VI (A): Street Lighting

Panchayats

kW

32

6.10

Municipalities

kW

32

6.60

Municipal Corporations

kW

32

7.10

LT VI (B): PWS Schemes

Panchayats

HP

32/HP subject to a minimum

of Rs.50/month

5.00

Municipalities

HP

32/HP subject to a minimum of

Rs.100/month

6.10

Municipal Corporations

HP

32/HP subject to a minimum

of Rs.100/month

6.60

LT VII: General

LT VII (A): General Purpose

kW

21

7.30

LT VII (B): Wholly Religious Places

Load upto 2 kW

kW

21

5.40

Load above 2 kW

kW

21

6.00

LT VIII: Temporary Supply

kW

21

11.00

High Tension

HT I(A): Industry General

11 kV

kVA

390

6.65

33 kV

kVA

390

6.15

132 kV and above

kVA

390

5.65

HT I(A):Lights and Fans

11 kV

6.65

33 kV

6.15

132 kV and above

5.65

HT I(A):Poultry Farms

11 kV

kVA

390

6.65

33 kV

kVA

390

6.15

HT I(A):Industrial Colonies

11 kV

6.30

33 kV

6.30

4

2

Category

Fixed/Demand Charge (Rs./Month)

Energy Charge

Unit

Rate

(Rs./kWh or Rs./kVAh)

132 kV and above

6.30

HT I(A):Seasonal Industries

11 kV

kVA

390

7.60

33 kV

kVA

390

6.90

132 kV and above

kVA

390

6.70

HT I(A):Optional Category with Load Up to 150 kVA

11 kV

kVA

80

7.00

HT I: Time of Day Tariffs (6 AM to 10 AM)

11 kV

7.65

33 kV

7.15

132 kV and above

6.65

HT I: Time of Day Tariffs (6 PM to 10 PM)

11 kV

7.65

33 kV

7.15

132 kV and above

6.65

HT I: Time of Day Tariffs (10 PM to 6 AM)

11 kV

5.65

33 kV

5.15

132 kV and above

4.65

HT I (A): Poultry Farms – Time of Day Tariffs (6 AM to 10 AM)

11 kV

7.65

33 kV

7.15

HT I (A): Poultry Farms – Time of Day Tariffs (6 PM to 10 PM)

11 kV

7.65

33 kV

7.15

HT I (A): Poultry Farms – Time of Day Tariffs (10 PM to 6 AM)

11 kV

5.65

33 kV

5.15

HT I(B):Ferro Alloy Units

11 kV

5.90

33 kV

5.50

132 kV and above

5.00

HT II OTHERS

11 kV

kVA

390

7.80

33 kV

kVA

390

7.00

132 kV and above

kVA

390

6.80

HT II: Time of Day Tariffs (6 AM to 10 AM)

11 kV

8.80

33 kV

8.00

132 kV and above

7.80

HT II: Time of Day Tariffs (6 PM to 10 PM)

11 kV

8.80

33 kV

8.00

132 kV and above

7.80

HT II: Time of Day Tariffs (10 PM to 6 AM)

11 kV

6.80

33 kV

6.00

132 kV and above

5.80

5 3

Category

Fixed/Demand Charge (Rs./Month)

Energy Charge

Unit

Rate

(Rs./kWh or Rs./kVAh)

HT III AIRPORTS, BUS STATIONS AND RAILWAY STATIONS

11 kV

kVA

390

7.50

33 kV

kVA

390

6.85

132 kV and above

kVA

390

6.45

HT III: Time of Day Tariffs (6 AM to 10 AM)

11 kV

8.50

33 kV

7.85

132 kV and above

7.45

HT III: Time of Day Tariffs (6 PM to 10 PM)

11 kV

8.50

33 kV

7.85

132 kV and above

7.45

HT III: Time of Day Tariffs (10 PM to 6 AM)

11 kV

6.50

33 kV

5.85

132 kV and above

5.45

HT IV (A) Irrigation & Agriculture

11 kV

kVA

165

5.80

33 kV

kVA

165

5.80

132 kV and above

kVA

165

5.80

HT IV(B) CP Water Supply Schemes

11 kV

5.10

33 kV

5.10

132 kV and above

5.10

HT V (A) Railway Traction

kVA

390

4.05

HT V (B) Hyderabad Metro Rail (HMR)

kVA

390

3.95

HT VI Townships & Residential Colonies

11 kV

kVA

60

6.30

33 kV

kVA

60

6.30

132 kV and above

kVA

60

6.30

HT VII: Temporary

11 kV

kVA

500

10.80

33 kV

kVA

500

10.00

132 kV and above

kVA

500

9.80

HT VIII: RESCO

11 kV

4.52

Terms and Conditions

  1. Fuel Surcharge Adjustment (FSA) is applicable in accordance with the provisions of the Electricity Act, 2003.
  2. The tariffs are exclusive of Electricity Duty payable as per the provisions of the AP Electricity Duty Act as adopted by the Government of Telangana State.
  3. Voltage surcharge: The voltage surcharge withdrawal stands continued even for FY 2018-19.

  4. Additional charges for maximum demand exceeding the contracted demand

    6

    4

    In case, in any month the Recorded Maximum Demand (RMD) of the consumer exceeds his Contracted Demand with the Licensee, the consumer shall pay the following charges on excess demand recorded and on the entire energy consumed.

    RMD over CMD

    Demand charges on excess demand

    Energy charges on full energy

    100 to 120%

    2 times of normal charge

    Normal

    Above 120% and up to 200%

    2 times of normal charge

    1.15 times of normal charge

    More than 200%

    2 times of normal charge

    1.20 times of normal charge

    In case of HT V(A) and HT V(B): Railway Traction and HMR, the energy charges shall be computed at 1.05 times of normal charges on the entire consumption, if RMD exceeds 120% of Contracted Demand.

  5. Minimum charges

    Category

    LT categories

    Rates for FY 2018-19

    LT I(A)

    Domestic

    Contracted Load of 1000 Watts and below

    Single Phase

    Rs. 25/month

    LT I(B)(i)

    Contracted Load of above 1000 Watts

    Single Phase

    Rs. 50/month

    LT I(B)(ii)

    Three Phase

    Rs. 150/month

    LT II(A) & II(B)

    Non-Domestic / Commercial

    Single Phase

    Rs. 65/month

    Three Phase

    Rs. 200/month

    LT II(C)

    Advertisement Hoardings

    Rs. 300/month

    LT II(D)

    Single Phase

    Rs. 65/month

    Three Phase

    Rs. 200/month

    LT VI(A)

    Street Lighting

    Panchayats

    Rs. 2/point/month

    Municipalities and Municipal Corporations

    Rs. 6/point/month

    LT VII(A)

    General Purpose

    Single Phase

    Rs. 50/month

    Three Phase

    Rs. 150/month

    LT VIII

    Temporary Supply

    Rs. 125 per kW or part thereof of the contracted load for first 30 days or part thereof and for every subsequent period of 15 days or part thereof a charge of Rs. 75 per kW.

    HT Categories

    Rates for FY 2018-19

    Billing Demand

    Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher except HT IV(A) and HT VI

    For HT IV(A) (Lift Irrigation), during the operational months July to November, Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher and,

    during the non-operational months December to June, Billing Demand shall be maximum demand recorded during the month or 20% of the contracted demand whichever is higher

    For HT VI (Township and Residential Colonies), the billing demand is Actual Demand Recorded)

    Minimum Energy Charges

    Rates for FY 2018-19

    HT I(A)

    Industry-General

    50 kVAh per kVA of billing demand per month

    HT I(B)

    Ferro Alloy units

    Maximum Demand or Average Actual Demand whichever is higher. The energy falling short of 6,701 kVAh per kVA per annum will be billed as deemed consumption. This shall be calculated on an annual basis and not on a monthly

    basis and disconnection periods shall be exempted while computing the minimum off-take

    HT II

    Others

    25 kVAh per kVA of billing demand per month

    7

    5

    HT III

    Airports, Bus Stations and Railway Stations

    50 kVAh per kVA of billing demand per month

    HT V(A) & V(B)

    Railway Traction & HMR

    32 kVAh per kVA of Contracted Demand per month

    HT VI

    Townships &

    Residential Colonies

    Billing Demand shall be Actual Recorded Demand.

    25 kVAh per kVA of contracted demand per month.

  6. Customer charges

    Consumer Category

    Rs./month

    Low Tension

    LT I: Domestic (Units/month)

    0-50

    Rs. 25

    51-100

    Rs. 30

    101-200

    Rs. 50

    201-300

    Rs. 60

    301-400

    Rs. 80

    401-800

    Rs. 80

    Above 800 units

    Rs. 80

    LT II (A&B):Non-Domestic/ Commercial (Units/month)

    0-50

    Rs. 45

    51-100

    Rs. 55

    101-300

    Rs. 65

    301-500

    Rs. 65

    Above 500 units

    Rs. 65

    LT II(C): Advertisement Hoardings

    Rs. 70

    LT II(D): Haircutting Salons with consumption upto 200 units per month

    0-50

    Rs. 45

    51-100

    Rs. 55

    101-200

    Rs. 65

    LT III: Industry up to 20 HP

    Rs. 75

    LT III: Industry 21-50 HP

    Rs. 300

    LT III: Industry 51-100 HP

    Rs. 1125

    LT IV: Cottage Industries

    Rs. 45

    LT V: Agriculture

    Rs. 30

    LT VI: Street Lighting & PWS

    Rs. 50

    LT VII: General Purpose

    Rs. 60

    LT VIII: Temporary Supply

    Rs. 65

    High Tension

    HT consumers at 11 kV

    Rs. 1685

    HT consumers at 33 kV

    Rs. 1685

    HT consumers at 132 kV and above

    Rs. 3370

  7. Delayed Payment Surcharge (DPS)

    LT Category

    1. In case of LT I(A), LT I(B), LT II(A), LT II(D), LT IV and LT V(B), if payment is made after due date, the consumers are liable to pay, Delayed Payment Surcharge (DPS) per month on the bill amount at the rates given in table below:

      LT I(A)

      Rs. 10 per month

      LT I(B), LT II(A), LT II(D), LT IV and LT V(B)

      Rs. 25 per month

    2. In case of LT II(B), LT II(C), LT III, LT VI, and LT VII, the Licensee shall levy Delayed Payment Surcharge (DPS) on the bill amount at the rate of 5 paise/ Rs. 100/ day calculated from the due

      8

      6

      date mentioned on the bill, up to the date of payment or Rs. 150 whichever is higher. In case of grant of installments, the Licensees shall levy interest at the rate of 18% per annum on the outstanding amounts compounded annually and the two (DPS and interest) shall not be levied at the same time.

      HT Category

      a) The Licensees shall charge the Delayed Payment Surcharge (DPS) per month on the bill amount at the rate of 5 paise/ Rs. 100/ day or Rs. 550 whichever is higher. In case of grant of installments, the Licensee shall levy interest at the rate of 18% per annum on the outstanding amounts, compounded annually and the two charges shall not be levied at the same time.

  8. Reconnection charges

    Low Tension services

    LT I(A)

    Rs. 25

    Overhead LT services

    Rs. 75

    U.G. services

    Rs. 200

    High Tension service

    11 kV

    Rs. 1000

    33 kV

    Rs. 2000

    132 kV and above

    Rs. 3000

  9. Testing charges

    Installation

    LT

    HT

    The first test and inspection of a new installation or of an extension to an existing installation

    Nil

    Nil

    Charges payable by the consumer in advance for each subsequent

    test and/or inspection if found necessary owing to any fault in the installation or to non-compliance of the conditions of supply

    Rs. 20

    Rs. 200

    Meter

    A.C. Single Phase Energy meter

    Rs. 100

    A.C. Three Phase Energy meter

    Rs. 300

    LT Tri Vector meter

    Rs. 2000

    11 kV

    Rs. 3000

    33 kV

    Rs. 3000

    132 kV and above

    Rs. 3000

    Transformer oil

    Each sample of oil

    Rs. 150 per sample

  10. Supervision / Inspection and checking charges

    For LT I(A) Domestic

    Rs. 100

    For LT I(B) Domestic

    Rs. 100

    LT Agricultural

    Rs. 100

    For all other LT Categories

    Rs. 100

    For all HT Categories

    Rs. 600

  11. Low power factor charges: For all consumer categories where kVAh billing is done, no Low Power Factor surcharge shall be levied.

  12. Capacitor surcharge: LT consumers (except LT I Domestic) having connected loads mentioned in table below shall pay capacitor surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if capacitors are found defunct.

    9

    7

    Category

    Connected Load

    LT II and LT VII(A)

    < 10 kW

    LT III and LT VI(B)

    < 20 HP

  13. Fixed Charges – Seasonal Industries:

LT III: Rs. 50/ HP/ month on 30% contracted load.

HT: Demand Charges – 30% of CMD or recorded demand whichever is higher.

Temporary Supply for LT and HT consumers: Temporary supply can be given initially for a period up to one year as per the tariff applicable under temporary supply category. After the expiry of one year, the consumer is at liberty to seek further extension.

10 8

ANNEXURE 2

Category

CSS for FY 2018-19 as

approved by the Commission

TSSPDCL

TSNPDCL

HIGH TENSION

HT Category at 11 kV

HT-I Industry Segregated

1.65

1.66

HT-II – Others

2.03

1.97

HT-III Airports, Railways and Bus stations

1.80

1.77

HT -IV Lift Irrigation and agriculture & CPWS

0.36

0.21

HT-VI Townships and Residential Colonies

1.31

0.90

HT-VII Temporary

2.76

–

HT Category at 33 kV

HT-I Industry Segregated

1.46

1.44

HT-II – Others

1.76

1.78

HT -IV Lift Irrigation and agriculture & CPWS

1.07

0.86

HT-VI Townships and Residential Colonies

1.32

1.29

HT Category at 132 kV

HT-I Industry Segregated

1.30

1.31

HT-II – Others

1.69

3.55

HT-III Airports, Railways and Bus stations

1.49

–

HT -IV Lift Irrigation and agriculture & CPWS

1.24

1.27

HT-V Railway Traction & HMR

1.27

1.05

HT-VI Townships and Residential Colonies

–

1.28

The Commission approved the Additional Surcharge of Rs. 0.52/kWh for FY 201819.

 

 

 

Faqs on Telangana electricity tariff charges

 

is tsnpdcl and tsspdcl tariff charges are same?

 

What is the tariff of Telangana power bill?
6.60 per unit. 1 unit cost in Telangana will be Rs. 2.60. Take a look at the table to read electricity charges per unit in telangana.
1 unit equals how many watts in telangana electricy bill?
1 unit = 1 kw or 1000 watts (10w led bulb 100hours or 4 days to burn 1 unit)

 

Recent Posts

  • why waqf bill amendment in 2025 full clarity April 7, 2025
  • Telangana LRS calculator & how calculation works 20000 for 150 for sqyrd * March 15, 2025
  • Telangana Ration Card application Status 2025 March 15, 2025
  • Telangana Ration Card List 2025: How to Check, Where to Check, Expected Release Date, and Rejection Reasons February 17, 2025
  • Telangana Ration Card Meeseva Application Process in 2025: Documents required February 17, 2025
  • Rapido bike taxi subscription vs Uber moto zero commission daily 30 February 10, 2025
  • Hyderabad drinking water schedule HMWSSB water supply issues news February 9, 2025
  • AP & Telangana driving licence at 300+1035 LLR & Permanent September 11, 2024
  • Telangana Ration card eligibility status download correction add /delete name eligibility September 11, 2024
  • Telangana Assigned lands POT 1977 & ROR ACT 1971 September 11, 2024
  • what is Fastag , how to get online, benefits, recharge more info September 11, 2024
  • Telangana double Bedroom scheme application status latest news beneficiary list September 11, 2024
  • how to become MLA / mp with no money through social media – Telugu September 11, 2024
  • TS RTO registration & status, transfer ownership, road tax payment, vehicle search, echallan payment details September 11, 2024
  • Krishna River Water Dispute history & pothireddypadu issue #KRMB #KWDT September 11, 2024

my name is raju i live in hyderabad as self employment or no employment basis, i do dig in intresting things follow me youtube